ADVERTISEMENT
sat on the dock and talked through what the boat needed. The list was long. The hull required patching and grinding and repainting. The cabin needed to come down and go back up. There was no working plumbing, the electrical was unsafe, the propane system was a fire hazard, and the bilge pump was seized solid. Walker said it was a six-month job done continue reading …
ADVERTISEMENT